Top 2 Bottom Pro Cleaners
Construction & Handover

From Practical Completion to happy move-ins.

Builders cleans, sparkle cleans, multi-trade snag support, digital twins and golden-thread handover packs — delivered across every RIBA stage from 4 through 6.

512
Handovers FY
98.1%
Snag Closed
386
MAT Scans
RIBA Plan of Work · 7 Stages
Project: Nova House · 282 Units
£142M GDV
Stage 5 · Close
0
Strategic
Strategic definition & site optioneering.
1
Prepare
Feasibility, planning, cost plan.
2
Design
Concept, scheme, detailed RIBA.
3
Specialist
Technical design & CDM H&S file.
4
Construct
Build phase, snag & ITPs.
5
Close
Handover, O&M, GOLDEN THREAD.
6
In Use
12-mo defects, lifecycle & aftercare.
Open Snags
24of 1,736 total
Signed-Off Plots
268of 282 total
Photo Logs
42.8Kstaged per room
Matterport Twins
282as-built scan
Golden Thread · Handover Pack
O&M · H&S File · CDM · Snag Register · Signed 14:32 today
BIM 360AconexProcoreMAT
5-Phase Delivery

The handover your main contractor deserves.

A 5-phase process every site follows — Builders → Sparkle → Snag → Sign-off → Aftercare — with live snag registers and Matterport sign-off.

Phased mobilisation plan
Site-by-site resource plot 12 weeks pre-PC, with directors named per scheme.
01
Phase 01

Builders Clean 1

Pre-handover · 2 weeks PC

Initial post-construction strip-out clean — scaffold debris, mortar smears, paint splatter, window film, floor protection uplift and builders compounds cleared.

18 staff on site
6 skips logistics
02
Phase 02

Sparkle Clean 2

PC · 7 days handover

High-detail sparkle clean — ceilings, cornices, high-level glazing, sanitaryware polish, floor sealant, communal areas, lobby and concierge set-up.

26 staff on site
2 hiab logistics
03
Phase 03

Snag Support

2 weeks pre & post

Multi-trade snag squads supporting handover meetings. Plaster, decor, door furniture, M&E commissioning, and kitchen/bathroom snag packs.

12 staff on site
on-site logistics
04
Phase 04

Handover Sign-off

PC + 0

Director-lead signing, Matterport digital twin scan, photo logs, snag register live, O&M manuals, H&S file, and golden-thread handover pack.

6 staff on site
1 van logistics
05
Phase 05

Aftercare 12-month

PC + 0 → +12

Defects rectification, seasonal commissioning re-visits, resident familiarisation, dilapidation-ready condition records at end of DL period.

4 staff on site
retained logistics
Snag Categories · 8

A snag register the JCT actually reads.

Photo-logged, location-tagged, and status-linked — every snag triaged against trade, priority and the PC milestone.

98%

Decor & Finishes

Items · Closed
410of 418
99%

Doors & Ironmongery

Items · Closed
194of 196
99%

Kitchen & Bathrooms

Items · Closed
318of 322
99%

Flooring & Tiling

Items · Closed
270of 274
99%

M&E Commissioning

Items · Closed
152of 154
98%

Glazing & Facade

Items · Closed
96of 98
99%

Communal Areas

Items · Closed
186of 188
95%

External Grounds

Items · Closed
82of 86
Handover Scorecard

Results the client references on the next tender.

Handovers delivered, defects closed, photographs captured and digital twins scanned — the same scorecard we bring to every pre-construction meeting.

5-phase handover methodology
Builder → Sparkle → Snag → Sign-off → Aftercare
Golden thread handover pack
O&M · H&S file · CDM · Fire strategy · As-built BIM
12-month retained aftercare
Seasonal commissioning visits + defects rectification
Handovers Delivered · FY
0
plots
41 schemes · BTR · PRS · Mixed-use · Commercial
Defects Closed
0%@ PC + 14d
Days post Practical Completion
Photo Logs (M)
0Mimages
Room staged68%
Defect close22%
Matterport10%
Digital Twins · Matterport Scans
0 scans · 0M hi-res images · 360° linked
As-built, as-handed, and year-1 condition records
ResiCommercialRetailEducationHealthInd.
Construction & Handover

Got a PC date on the calendar? Let's beat it.

Book a 30-minute intro with our Construction & Handover lead — we'll walk through a live snag register example and the 5-phase mobilisation we run for every main contractor.

Builder / Sparkle
2 phase pre-PC
Snag Support
Multi-trade squads
Handover Packs
Golden thread · O&M
Digital Twins
Matterport · Photo log